(#1) Construction began in 1990
with the clean up of the totally caved in barn. It had been let go for
years but the walls were in great shape.

(#2) Cleaned down to the walls
the top was capped in with a frame to pour concrete. This would give an even top for the
second floor and roof trusses.

(#3) Framing begins, this is
looking out back from the control room.

(#4) The main room with the high
ceiling.

(#5) The roof goes up.

(#6) Inside construction and
wiring went on during the winter.

(#7) The studio was completed in Feb of 1991 and
moved from it’s old location on main street in Acton.