CONSTRUCTION
Click on button for a larger picture


#1


#2


#3


#4


#5


#6


#7



(#1) Construction began in 1990 with the clean up of the totally caved in barn. It had been let go for years but the walls were in great shape.



(#2) Cleaned down to the walls the top was capped in with a frame to pour concrete. This would give an even top for the second floor and roof trusses.



(#3) Framing begins, this is looking out back from the control room.




(#4) The main room with the high ceiling.



(#5) The roof goes up.



(#6) Inside construction and wiring went on during the winter.



(#7) The studio was completed in Feb of 1991 and moved from it’s old location on main street in Acton.


HOME / FACILITIES / EQUIPMENT / RATES / CLIENTS /OWNER / CONSTRUCTION/ CONTACT US/ SERVICES/ STAFF